Railway Timetable 2008

Open: 21st March - 2nd November 2008

Showing connections with Windermere Lake Cruises

Haverthwaite Dep.       1040 1150 1300 1405 1510 1615C 1720A
Newby Bridge Dep.       1052 1202 1312 1417 1522 1627C 1732A
Lakeside Arr.       1058 1208 1318 1423 1528 1633C 1738A
Lakeside Dep.   0915 1015 1120 1230 1335 1440 1545 1650C  
Bowness Arr.   0955 1055 1200 1310 1415 1520 1625 1730C  
Bowness Dep.   1010 1110 1220 1325 1430 1540 1635 1740C 1810B
Ambleside Arr.   1040 1140 1250 1355 1505 1610 1705 1810C 1840B

Ambleside Dep. 0950 1050 1200 1305 1410 1520 1620 1710C    
Bowness Arr. 1020 1120 1230 1335 1440 1550 1650 1740C    
Bowness Dep. 1030 1140 1245 1350 1455 1600 1700C 1745C    
Lakeside Arr. 1110 1220 1325 1430 1535 1640 1740C 1825C    
Lakeside Dep. 1115 1230 1335 1440 1545 1650C 1748A      
Newby Bridge Dep. 1121 1236 1341 1446 1551 1656C 1754A      
Haverthwaite Arr. 1133 1248 1353 1458 1603 1708C 1806A      

'A' operates 25th May to 1st June & 20th July to 29th August and may be diesel hauled
'B' operates 22nd June to 31st August
'C' does not operate after 25th October
 

Prices and Timetable information subject ot alternation without notice.
Under normal circumstances the trains are steam hauled.

For operational reasons the steamers may occasionally be substituted by a motor launch.
The company accepts no liability for any inaccuracy in the information contained in this leaflet.